Finally we have the trans and the Phoenix guys aren't wasting any time.
All dormant wiring in both the engine bay and interior has been removed. Woo Hoo.. no more hazzardous Lotus wiring!
Complete interior strip also done including dash and ancillaries. Dash, seats, harnesses all ready to go back in.. maybe a coat of paint first tho.
Engine has been temporarily in the vehicle for measurement without the gearbox, removal of both exhaust pipes done and shortened. They require to be turned around so the pipes are at the top of the engine instead ofthe bottom. This is required due to the rear sub frame fouling the exhausts and due to the fact that the driveshaft's will not fit in their current position either.
G50-50 end casing has been removed from the gearbox for strip.
I sent John a pdf manual/assembly diagram for the circa 1989 Porsche G50-50 gearbox so they can strip further. The spray bar will require modification if the box needs to be fitted alternatively but the issue is, John does not want to damage any material without knowing what the inside of the box looks like. If anything falls out or becomes dislodged as they strip, it could be particularly difficult to find out where it belongs! Will then need to check for a cooler, pump etc.
Firewall has also been removed today to create space for the engine and gearbox as expected.
Lots of challenges ahead but it's good to see some sort of light at the end of tunnel and I've every confidence in John, Alan and big Stevie.
I best get down fast to take some pics as John has got this project firmly on the move!!!